Solar panels in Marbella, installed and legalised for one fixed price

We design, fit and register solar systems for villas, townhouses and communities between Estepona and Mijas. One written quote covers the panels, the permits and the paperwork with your electricity company.

  • Free survey and written quote
  • Town hall, Junta and grid paperwork included
  • English and Spanish spoken
Solar panels fitted on a terracotta tile roof above a garden

Today over Marbella

Marbella gets between 9 hours 40 minutes of daylight in December and 14 hours 40 minutes in June. Even in the shortest month, an 11-panel roof here makes about 15 kWh on an average day.

The same panel makes two-thirds more here than in London

PVGIS, the European Commission’s solar database, gives a south-facing roof in Marbella about 1,675 kWh a year for every kilowatt of panels. Málaga’s weather station records 2,905 hours of sunshine a year. Few places in Europe do better.

When the sun shines matters as much. A home here uses most in summer, with the air conditioning and the pool pump running all day, which is exactly when the roof produces most. Winter is lower but far from nothing: December still gives half of what July does.

One kilowatt of panels, one year kWh produced at the best roof angle for each city
Marbella
1,712
Berlin
1,053
Amsterdam
1,027
London
1,023
Stockholm
989
Dublin
988
What an 11-panel roof in Marbella produces each month kWh, for 4,950 W of panels facing south. About 8,290 kWh over the year.
Show these figures as a table
Month Output (kWh) Per day (kWh)
January 507 16.4
February 524 18.7
March 677 21.8
April 748 24.9
May 869 28.0
June 886 29.5
July 910 29.4
August 860 27.7
September 729 24.3
October 624 20.1
November 498 16.6
December 459 14.8

Source: PVGIS 5.3, European Commission Joint Research Centre. Satellite records for 2005 to 2023, 20° roof pitch, 14% system losses.

What we do

An installer lifting a black solar panel into place on a roof under a clear blue sky

Solar panel installation

Design, supply and fitting on tile, flat and metal roofs, from a four-panel penthouse system to a villa with thirty. The price includes the inverter, the monitoring app and every permit, and the system is registered in your name before we call the job finished.

Two home batteries and a hybrid inverter mounted on a white wall

Battery storage

Keep the day’s surplus for the evening, and keep the lights on in a power cut. Fitted with new panels or added to a system you already have.

Solar panels being washed with a long-handled soft brush

Maintenance and cleaning

Saharan dust and long dry summers take a few percent off every array on this coast. We clean, check and repair systems, including ones we did not install.

From first visit to first lower bill

Most homes are producing three to six weeks after accepting the quote. You deal with one company throughout.

  1. Survey

    We measure the roof, check the meter and consumer unit, look for shade, and go through a year of your bills.

  2. Design and quote

    You get a layout drawn on your own roof, its expected output month by month, and one price with IVA included.

  3. Permits

    We file the declaration with the town hall and request the tax rebate. In a community, we help with the vote.

  4. Installation

    One to two days for most homes: fixings, panels, inverter, connection to your consumer unit, testing.

  5. Legalisation

    We register the system with the Junta and the grid operator, and set up payment for your surplus.

What a system looks like for a home like yours

Guide figures for four common situations, all without a battery and with IVA included.

Home Monthly bill System Yearly output Yearly saving Guide price Pays back in
Penthouse or small townhouse €80 4 panels, 1.8 kWp 2,880 kWh €320 €2,600 to €3,500 8 to 11 years
Family townhouse €130 7 panels, 3.15 kWp 5,040 kWh €560 €3,800 to €5,000 7 to 9 years
Villa with a pool €220 11 panels, 4.95 kWp 7,920 kWh €1,040 €5,500 to €6,900 5 to 7 years
Large villa, pool and air conditioning €380 20 panels, 9 kWp 14,400 kWh €1,890 €9,100 to €11,400 5 to 6 years

Worked out with the same assumptions as the calculator below. A battery, a difficult roof or an unusual tariff changes the picture. The cost guide explains what goes into the price.

Work out your own numbers

Set the slider to what you pay in an average month. Everything else follows from that.

€150
When do you use most of it?

Pool pump, air conditioning or working from home all count as daytime.

A guide, not a quote. It assumes electricity at €0.19 per kWh with taxes, 1,600 kWh a year from each kWp of panels, and €0.06 for each kWh you export. Your roof, tariff and habits will move the numbers; a survey replaces every assumption with a measurement.

You would save about €650 a year, 36% of what you pay now

System
8 panels, 3.6 kWp
Roof needed
about 16 m²
Yearly output
5,760 kWh
From your own roof
35% of the electricity you use
Guide price, IVA included
€4,200 to €5,500
Pays for itself in
7 to 9 years
Get a free quote for this system

Along the coast, from Estepona to Mijas

We work across Marbella and the towns either side of it. Each has its own kind of housing, its own roofs and its own town hall, and all three change how a solar project goes: pines in Elviria, community statutes in Nueva Andalucía, salt air in Puerto Banús.

What to know about solar in your area

White apartment buildings around the marina at Puerto Banús, with La Concha mountain behind
Puerto Banús under La Concha. Photo: Tom Wheatley.

Common questions

Short answers to what people usually want to know first. The rules were checked in November 2026.

All questions and answers

How much do solar panels cost in Marbella?

For a home, between about €1,000 and €1,500 for each kWp installed, IVA included. In round numbers: €3,500 to €4,500 for a small 3 kWp system, €5,000 to €7,500 for 5 kWp, and €10,000 to €13,000 for 10 kWp. A battery adds roughly €3,000 to €4,000 for 5 kWh or €4,500 to €6,500 for 10 kWh.

What moves the price is the roof more than the panels: how it is reached, what it is made of, how far the cable has to run to your consumer unit. That is why we quote after seeing it. Our cost guide breaks the figures down.

Is there an IBI discount for solar panels in Marbella?

No. Many websites still quote one, but Marbella’s 2026 tax ordinance has no IBI rebate for solar. What Marbella does offer is a 95% rebate on the construction tax (ICIO) for the solar part of the work. It has to be requested when the paperwork is filed, and we do that for you.

Other town halls differ. Estepona discounts ICIO by 50%. Mijas approved a 50% IBI rebate in October 2026 that is expected to apply from 2027. We check the ordinance for your municipality when we quote.

Do I need planning permission?

Not a building licence. In Andalucía, solar panels on an existing building on urban land are handled with a declaración responsable, a signed declaration filed with the town hall, and work can start once it is filed. We prepare and file it.

The exceptions are protected buildings and their surroundings, which need approval from the heritage authority first. In Marbella’s old town we check with the planning office before designing anything.

Will my panels keep the house running in a power cut?

Not on their own. A standard solar inverter is required to shut down when the grid fails, so that it cannot feed electricity into lines people may be working on. Many owners found this out during the Iberian blackout of 28 April 2025.

To keep running you need a battery and an inverter with a backup function, wired so that the house, or the circuits you choose, is isolated from the grid when it goes down. It is worth deciding at the design stage; adding it later costs more.

I live in an apartment block. Can I have solar panels?

Yes, more easily than most people think. Under article 17.1 of the Horizontal Property Act, a renewable energy system, whether shared or for one owner’s private use on the communal roof, can be approved by one third of the owners representing one third of the participation quotas. Owners who do not vote for a shared system do not pay for it, and can join later by paying their share.

We can attend the owners’ meeting with a design and the figures, which tends to make the vote straightforward.

Get a free quote

Tell us about the property and we will reply within one working day. The survey takes about an hour. A few days later you have a written quote with a drawing of your roof and the output we expect from it.

It helps to have a recent electricity bill to hand, but you can send the request without one.

Give us at least one of the two, whichever you prefer we use.

We reply within one working day. No sales calls, no passing your details on.

Get a free quote